10.46243/jst.2022.v7.i02.pp301-314 registered
IMPACT OF CRITICAL FACTORS ON CONSTRUCTION PROJECT
Resolves to https://www.jst.org.in/index.php/pub/article/view/485
Held by Longman Publishers (India) · prefix 10.46243 live · DOI address https://doi.org/10.46243/jst.2022.v7.i02.pp301-314
Registered 29 Sep 2026 via crossref · record version 2 · last change 29 Sep 2026, 11:59 PM · record sha256 af5c26af5ffddd0c…
Resolve ⬇ Record (JSON) ⬇ Kernel Metadata Declaration (XML) Compare with Crossref Cite (APA · BibTeX · RIS · CSL)
Also as schema.org JSON-LD · Turtle · RDF/XML · DataCite XML · Crossref UNIXREF · Crossref UNIXSD — the formats of the DOI content-negotiation service, from this record (which carries what).
What the DOI identifies
JournalArticle — an article in a journal · Digital · Visual · en
IMPACT OF CRITICAL FACTORS ON CONSTRUCTION PROJECT (PrincipalTitle · en)
Published 2022-07-03
Part of Journal of Science & Technology · ISSN 2456-5660 · volume 7 · issue 2 · pages 301–314
Agents
- Mayank S. Vadodia Mayank S. Vadodia (author)
- Longman Publishers (publisher)
Identifiers DOI 10.46243/jst.2022.v7.i02.pp301-314
Abstract · en
The local construction industry is facing insurmountable challenges, which caused deterioration day by day. Almost most projects in India face difficulties to achieve the desired results. Many causative factors affect on planning, scheduling, and execution stage during the project life. Many countries have researched, to find out what is the prime cause of delay and cost overrun. Many approaches were added with time to identify and mitigate the root cause of such addressed issue but no one get success to quantify it appropriately. This reason is highly varying viz country to country, region to region. So, need the study thoroughly the condition to mitigate the effect of factors and avoid them. The purpose of this research is to identify and evaluate the critical factors causing an impact on the construction industry. Through a questionnaire survey, total 110 numbers of questionnaires were distributed to the stakeholders like government and private contractors, supervisors, site engineers, and architecture, 62 critical factors causing were identified and divided into five categories. The survey data was analyzed using Cronbach’s alpha for reliability check and utilizing the relative importance index (RII) for the ranking. The study found that the impact of the top ten ranking factors among 62 factors are (1) Late delivery and logistics of materials, (2) Continuous breakdown of Published by: Longman Publishers www.jst.org.in P age 301 | 14 www.jst.org.in DOI: https://doi.org/10.46243/jst.2022.v7.i02.pp301-314 machinery, (3) Lack of experience (Consultant related), (4) Lack of modern equipment, (5) Fluctuation of construction materials prices, (6) Waste generation, (7) Low salary for engineers and construction workers, (8) Lack of experience, (9) Poor site management and supervision, (10) Poor financial control and management. These findings of the study will help to improve the existing status of the construction industry and to be used as a variable in future prediction models and management
System metadata — ISO 26324:2025, Annex B · DOI Handbook 10.1
Each element by the standard's name (Annex B: reference elements, then administrative) and the Handbook's (in grey), read off the record above.
| Element | Value | In the record |
|---|---|---|
| DOI Name DOI name | 10.46243/jst.2022.v7.i02.pp301-314 | doi |
| Referent Type referentType | Creation | referent |
| Referent Sub-Type referentSubType | JournalArticle — an article in a journal | type |
| Referent Name(s) referentName(s) | IMPACT OF CRITICAL FACTORS ON CONSTRUCTION PROJECT (PrincipalTitle, en) | titles |
| Basic Metadata basicMetadata | author: Mayank S. Vadodia Mayank S. Vadodia publisher: Longman Publishers published: 2022-07-03 part of: Journal of Science & Technology · ISSN 2456-5660 · vol. 7 · no. 2 · pp. 301–314 language: en form: Digital · Visual · Language | agents, dates, container, language, structural_type, modes, characters |
| Referent Identifier(s) alternateIdentifier(s) | none besides the DOI | identifiers, relations (IsSameAs) |
| Registration Authority registrationAuthorityCode | Crossref — issued by Crossref (member 25296); held here as a copy | record.source_agency (our code, ra_doi_name, for names issued here once appointed) |
| Created Date issueDate | 2024-02-16 | record.registered (when the DOI name was first registered) |
| relatedIdentifiers | none needed — the descriptive metadata is in this record | container, relations (only where the descriptive metadata lives at another identifier) |
complete Every System Metadata element is here, with the basic metadata a journal article needs.
The System Metadata Declaration (JSON) · the Kernel Metadata Declaration (XML) · what each sub-type needs
Cited by — in this registry
No record held in this registry cites this DOI.
Counts only records held in this registry; a citation from a work held elsewhere is not seen here. The list as JSON
References with DOIs
The record lists 10 references; 10 carry a DOI.
| # | Reference | DOI | Held here |
|---|---|---|---|
| 1 | ref1 [1] Yaser Gamil & Ismail Abdul Rahman (2018): Assessment of critical factors contributing to construction failure in Yemen, International Journal of Construction Management, DOI: … | 10.1080/15623599.2018.1484866 | not held here |
| 2 | ref2 [2] Dual M. Khlaifat, Reem E. Alyagoub, Rateb J. Sweis & Ghaleb J. Sweis (2017): Factors leading to construction projects' failure in Jordon, International Journal of Construction… | 10.1080/15623599.2017.1382092 | not held here |
| 3 | ref3 [3] Malek Mishmish & Sameh M. El-Sayegh (2016): Causes of claims in road construction projects in the UAE, International Journal of Construction Management, DOI: 10.1080/15623599.… | 10.1080/15623599.2016.1230959 | not held here |
| 4 | ref4 [4] Mohamed Saad Bajjou & Anas Chafi (2018): Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, DOI: 10.1080/15… | 10.1080/15623599.2018.1484859 | not held here |
| 5 | ref5 [5] A. M. El-Kholy & A. Y. Akal (2019): Determining the stationary financial cause of contracting firms failure, International Journal of Construction Management, DOI: 10.1080/156… | 10.1080/15623599.2019.1584836 | not held here |
| 6 | ref6 [6] Dickson Osei-Asibey, Joshua Ayarkwa, Alex Acheampong, Emmanuel Adinyira & Peter Amoah (2021): Impacts of accidents and hazards on the Ghanaian construction industry, Internati… | 10.1080/15623599.2021.1920161 | not held here |
| 7 | ref7 [7] Shakil Ahmed, Hamidul Islam, Ikramul Hoque & Mehrab Hossain (2018): Reality check against skilled worker parameters and parameters failure effect on the construction industry … | 10.1080/15623599.2018.1487158 | not held here |
| 8 | ref8 [8] I. M. C. S. Illankoon, Vivian W. Y. Tam, Khoa N. Le & K. A. T. O. Ranadewa (2019): Causes of disputes, factors affecting dispute resolution and effective alternative dispute r… | 10.1080/15623599.2019.1616415 | not held here |
| 9 | ref9 [9] K.Z. Sha'ar, S.A. Assaf, T. Bambang, M. Babsail & A.M. Abd El Fattah (2016): Design–construction interface problems in large building construction projects, International Jour… | 10.1080/15623599.2016.1187248 | not held here |
| 10 | ref10 [10] Vandana Bhavsar, Shaun Thomas Alex, Vaishnav P. K., Abraham Jose, Nevin George Koshy & Shubham Atiwadkar (2020): Investigation of critical factors influencing the constructio… | 10.1080/15623599.2020.1831220 | not held here |
Relations
The record states no relation, and no record held here states one with this DOI.
Funding
The record names no funder.
Each funder's page lists every work held here that names it. ROR IDs open at ror.org; Funder Registry IDs resolve at doi.org.
History — the ledger
Every change to this DOI, in order, as it was recorded. Entries are only ever added, never changed or removed.
| # | When | What | By | Changes |
|---|---|---|---|---|
| 1 | 29 Sep 2026, 10:00 PM | register registered at Crossref; record read from api.crossref.org | Administrator (admin) | 84 fields set · sha256 99f54d1010a5… |
| 2 | 29 Sep 2026, 11:59 PM | update record re-read from api.crossref.org | Administrator (admin) | container.titles.0.value: |
Machine-readable: the history as JSON, with the full record after each change.
Changes made at Crossref through DOI Doctor
Every deposit Smart Scholars' DOI Doctor made for this DOI, oldest first, with Crossref's own answer. Each fingerprint is the SHA-256 of its entry and of the fingerprint before it, so a change to any earlier entry changes every fingerprint after it.
| When | What changed | Crossref | Fingerprint |
|---|---|---|---|
| 11 Sep 2026, 05:18 | Address updated from https://jst.org.in/index.php/pub/article/view/485/427 to https://www.jst.org.in/index.php/pub/article/view/485 | ● accepted by Crossref | c932b96ce3c9… |
| 13 Sep 2026, 01:40 | Read back: the DOI resolves to the new address | ● confirmed | 9fb5a4ede997… |
| 07 Oct 2026, 07:37 | Metadata completed abstract (299 words) · licence | ● accepted by Crossref | 5d397710a38f… |
| 07 Oct 2026, 08:47 | Read back: Crossref's record shows it | ● confirmed | b6e018b3f389… |
4 entries · the last fingerprint b6e018b3f38927556606cb682fa2618fb0f123836f48af3fe40bfab3cd2c8540 · the history as JSON, each entry with the fingerprint before it, to check them yourself.



