Smart Scholars🛡 Scholar Shield🏛 Research Integrity Desk🧩 Portfolio Console📰 Journals🔧 DOI MembersTools🔎 Journal AuditGI GetIndexedDr DOI Doctor

Cite this DOI

10.46243/jst.2022.v7.i02.pp301-314 · IMPACT OF CRITICAL FACTORS ON CONSTRUCTION PROJECT

APA (7th edition)

Mayank S. Vadodia, M. S. V. (2022). IMPACT OF CRITICAL FACTORS ON CONSTRUCTION PROJECT. *Journal of Science & Technology*, *7*(2), 301–314. https://doi.org/10.46243/jst.2022.v7.i02.pp301-314

⬇ text Italics are shown as *asterisks* in plain text — the journal or book title and the volume.

BibTeX

@article{mayanksvadodia2022impact,
  author    = {Mayank S. Vadodia, Mayank S. Vadodia},
  title     = {{IMPACT OF CRITICAL FACTORS ON CONSTRUCTION PROJECT}},
  journal   = {Journal of Science \& Technology},
  year      = {2022},
  month     = {jul},
  volume    = {7},
  number    = {2},
  pages     = {301--314},
  publisher = {Longman Publishers},
  issn      = {2456-5660},
  doi       = {10.46243/jst.2022.v7.i02.pp301-314},
  url       = {https://doi.org/10.46243/jst.2022.v7.i02.pp301-314},
  language  = {en},
  abstract  = {The local construction industry is facing insurmountable challenges, which caused deterioration day by day. Almost most projects in India face difficulties to achieve the desired results. Many causative factors affect on planning, scheduling, and execution stage during the project life. Many countries have researched, to find out what is the prime cause of delay and cost overrun. Many approaches were added with time to identify and mitigate the root cause of such addressed issue but no one get success to quantify it appropriately. This reason is highly varying viz country to country, region to region. So, need the study thoroughly the condition to mitigate the effect of factors and avoid them. The purpose of this research is to identify and evaluate the critical factors causing an impact on the construction industry. Through a questionnaire survey, total 110 numbers of questionnaires were distributed to the stakeholders like government and private contractors, supervisors, site engineers, and architecture, 62 critical factors causing were identified and divided into five categories. The survey data was analyzed using Cronbach’s alpha for reliability check and utilizing the relative importance index (RII) for the ranking. The study found that the impact of the top ten ranking factors among 62 factors are (1) Late delivery and logistics of materials, (2) Continuous breakdown of Published by: Longman Publishers www.jst.org.in P age 301 | 14 www.jst.org.in DOI: https://doi.org/10.46243/jst.2022.v7.i02.pp301-314 machinery, (3) Lack of experience (Consultant related), (4) Lack of modern equipment, (5) Fluctuation of construction materials prices, (6) Waste generation, (7) Low salary for engineers and construction workers, (8) Lack of experience, (9) Poor site management and supervision, (10) Poor financial control and management. These findings of the study will help to improve the existing status of the construction industry and to be used as a variable in future prediction models and management}
}

⬇ .bib

RIS (EndNote, Zotero, Mendeley)

TY  - JOUR
TI  - IMPACT OF CRITICAL FACTORS ON CONSTRUCTION PROJECT
AU  - Mayank S. Vadodia, Mayank S. Vadodia
JO  - Journal of Science & Technology
PY  - 2022
DA  - 2022/07/03/
VL  - 7
IS  - 2
SP  - 301
EP  - 314
PB  - Longman Publishers
SN  - 2456-5660
LA  - en
AB  - The local construction industry is facing insurmountable challenges, which caused deterioration day by day. Almost most projects in India face difficulties to achieve the desired results. Many causative factors affect on planning, scheduling, and execution stage during the project life. Many countries have researched, to find out what is the prime cause of delay and cost overrun. Many approaches were added with time to identify and mitigate the root cause of such addressed issue but no one get success to quantify it appropriately. This reason is highly varying viz country to country, region to region. So, need the study thoroughly the condition to mitigate the effect of factors and avoid them. The purpose of this research is to identify and evaluate the critical factors causing an impact on the construction industry. Through a questionnaire survey, total 110 numbers of questionnaires were distributed to the stakeholders like government and private contractors, supervisors, site engineers, and architecture, 62 critical factors causing were identified and divided into five categories. The survey data was analyzed using Cronbach’s alpha for reliability check and utilizing the relative importance index (RII) for the ranking. The study found that the impact of the top ten ranking factors among 62 factors are (1) Late delivery and logistics of materials, (2) Continuous breakdown of Published by: Longman Publishers www.jst.org.in P age 301 | 14 www.jst.org.in DOI: https://doi.org/10.46243/jst.2022.v7.i02.pp301-314 machinery, (3) Lack of experience (Consultant related), (4) Lack of modern equipment, (5) Fluctuation of construction materials prices, (6) Waste generation, (7) Low salary for engineers and construction workers, (8) Lack of experience, (9) Poor site management and supervision, (10) Poor financial control and management. These findings of the study will help to improve the existing status of the construction industry and to be used as a variable in future prediction models and management
DO  - 10.46243/jst.2022.v7.i02.pp301-314
UR  - https://doi.org/10.46243/jst.2022.v7.i02.pp301-314
ER  -

⬇ .ris

CSL-JSON

{
    "type": "article-journal",
    "id": "10.46243/jst.2022.v7.i02.pp301-314",
    "DOI": "10.46243/jst.2022.v7.i02.pp301-314",
    "URL": "https://doi.org/10.46243/jst.2022.v7.i02.pp301-314",
    "title": "IMPACT OF CRITICAL FACTORS ON CONSTRUCTION PROJECT",
    "source": "Smart Scholars DOI Registry",
    "container-title": "Journal of Science & Technology",
    "author": [
        {
            "family": "Mayank S. Vadodia",
            "given": "Mayank S. Vadodia"
        }
    ],
    "issued": {
        "date-parts": [
            [
                2022,
                7,
                3
            ]
        ]
    },
    "volume": "7",
    "issue": "2",
    "page": "301-314",
    "publisher": "Longman Publishers",
    "language": "en",
    "abstract": "The local construction industry is facing insurmountable challenges, which caused deterioration day by day. Almost most projects in India face difficulties to achieve the desired results. Many causative factors affect on planning, scheduling, and execution stage during the project life. Many countries have researched, to find out what is the prime cause of delay and cost overrun. Many approaches were added with time to identify and mitigate the root cause of such addressed issue but no one get success to quantify it appropriately. This reason is highly varying viz country to country, region to region. So, need the study thoroughly the condition to mitigate the effect of factors and avoid them. The purpose of this research is to identify and evaluate the critical factors causing an impact on the construction industry. Through a questionnaire survey, total 110 numbers of questionnaires were distributed to the stakeholders like government and private contractors, supervisors, site engineers, and architecture, 62 critical factors causing were identified and divided into five categories. The survey data was analyzed using Cronbach’s alpha for reliability check and utilizing the relative importance index (RII) for the ranking. The study found that the impact of the top ten ranking factors among 62 factors are (1) Late delivery and logistics of materials, (2) Continuous breakdown of Published by: Longman Publishers www.jst.org.in P age 301 | 14 www.jst.org.in DOI: https://doi.org/10.46243/jst.2022.v7.i02.pp301-314 machinery, (3) Lack of experience (Consultant related), (4) Lack of modern equipment, (5) Fluctuation of construction materials prices, (6) Waste generation, (7) Low salary for engineers and construction workers, (8) Lack of experience, (9) Poor site management and supervision, (10) Poor financial control and management. These findings of the study will help to improve the existing status of the construction industry and to be used as a variable in future prediction models and management",
    "ISSN": "2456-5660"
}

⬇ .json What citeproc and reference managers read; the DOI system hands it out for Accept: application/vnd.citationstyles.csl+json, and so does this registry's resolver.

From the record as registered (version 2) — the record and its history. Programs: https://registry.smartscholars.in/api.php?action=cite&doi=10.46243%2Fjst.2022.v7.i02.pp301-314 gives all four in one JSON answer.

Everything Smart Scholars runsNine sites, one account. A journal starts at the audit; an author starts at Scholar Shield.

For journals & publishers

Start with the audit — it is free, and it is the gate to everything else.

DOI care

Nine services on one journal profile — each previews first and acts only on your approval.

For authors & researchers

Free to use. Nothing you check is shared with the journal.

For institutions, sponsors & DOI operators

Smart Scholars

Mon–Sat, 10:00–19:00 IST. The Ask AI button on every page answers about our services at any hour.

News

Policies

What we can register a DOI for

20 kinds of record, one account, one place. Every one gets a DOI that resolves, metadata that indexes read, and a record that stays correct afterwards.
Journals
  • Journal articles
  • Journal titles
  • Pending publications
  • Peer reviews
  • Preprints & posted content
Books & conferences
  • Books
  • Book chapters
  • Book series
  • Book sets
  • Conference proceedings
  • Proceedings series
  • Conference papers
Other research output
  • Theses & dissertations
  • Reports & working papers
  • Report series
  • Standards
  • Databases
  • Datasets
  • Figures, tables & supplements
Funding
  • Grants & funding awards

Elsewhere

The same company, in the places our publishers already read.
Smart Scholars · Every service on one pageData from OpenAlex (openalex.org), CC0 · Crossref · ISSN Portal · DOAJContact
WhatsApp