10.46243/jst.2022.v7.i02.pp281-290 registered
An evaluation of the causes of construction project delays in the urban areas of South Gujarat
Resolves to https://www.jst.org.in/index.php/pub/article/view/470
Held by Longman Publishers (India) · prefix 10.46243 live · DOI address https://doi.org/10.46243/jst.2022.v7.i02.pp281-290
Registered 29 Sep 2026 via crossref · record version 2 · last change 29 Sep 2026, 11:59 PM · record sha256 7d43a3b8562909a4…
Resolve ⬇ Record (JSON) ⬇ Kernel Metadata Declaration (XML) Compare with Crossref Cite (APA · BibTeX · RIS · CSL)
Also as schema.org JSON-LD · Turtle · RDF/XML · DataCite XML · Crossref UNIXREF · Crossref UNIXSD — the formats of the DOI content-negotiation service, from this record (which carries what).
What the DOI identifies
JournalArticle — an article in a journal · Digital · Visual · en
An evaluation of the causes of construction project delays in the urban areas of South Gujarat (PrincipalTitle · en)
Published 2022-07-03
Part of Journal of Science & Technology · ISSN 2456-5660 · volume 7 · issue 2 · pages 281–290
Agents
- Smit S. Chaudhari Smit S. Chaudhari (author)
- Longman Publishers (publisher)
Identifiers DOI 10.46243/jst.2022.v7.i02.pp281-290
Abstract · en
In India, construction projects are facing major problems due to delays. These problems are harming economic success and development. The purpose of this study is to identify the most significant factors that cause delays in construction projects through a survey. A survey was carried out on the various stack holders of construction industries such as a rchitects, engineers, owners, contractors, supervisors, and labours. Out of 30 reasons, 5 major factors are identified using the Relative Important Index (RII) method. The case study results suggest that the most critical factors are Poor monitoring and co ntrol, Rework due to errors during construction, High labour wages, Lack of communication with consultant/owner, and Shortage of labour. These findings are likely to contribute significantly to the Indian construction industry's control of project time and cost overrun
System metadata — ISO 26324:2025, Annex B · DOI Handbook 10.1
Each element by the standard's name (Annex B: reference elements, then administrative) and the Handbook's (in grey), read off the record above.
| Element | Value | In the record |
|---|---|---|
| DOI Name DOI name | 10.46243/jst.2022.v7.i02.pp281-290 | doi |
| Referent Type referentType | Creation | referent |
| Referent Sub-Type referentSubType | JournalArticle — an article in a journal | type |
| Referent Name(s) referentName(s) | An evaluation of the causes of construction project delays in the urban areas of South Gujarat (PrincipalTitle, en) | titles |
| Basic Metadata basicMetadata | author: Smit S. Chaudhari Smit S. Chaudhari publisher: Longman Publishers published: 2022-07-03 part of: Journal of Science & Technology · ISSN 2456-5660 · vol. 7 · no. 2 · pp. 281–290 language: en form: Digital · Visual · Language | agents, dates, container, language, structural_type, modes, characters |
| Referent Identifier(s) alternateIdentifier(s) | none besides the DOI | identifiers, relations (IsSameAs) |
| Registration Authority registrationAuthorityCode | Crossref — issued by Crossref (member 25296); held here as a copy | record.source_agency (our code, ra_doi_name, for names issued here once appointed) |
| Created Date issueDate | 2024-02-16 | record.registered (when the DOI name was first registered) |
| relatedIdentifiers | none needed — the descriptive metadata is in this record | container, relations (only where the descriptive metadata lives at another identifier) |
complete Every System Metadata element is here, with the basic metadata a journal article needs.
The System Metadata Declaration (JSON) · the Kernel Metadata Declaration (XML) · what each sub-type needs
Cited by — in this registry
No record held in this registry cites this DOI.
Counts only records held in this registry; a citation from a work held elsewhere is not seen here. The list as JSON
References with DOIs
The record lists 15 references; 6 carry a DOI.
| # | Reference | DOI | Held here |
|---|---|---|---|
| 2 | ref2 R. K. Shah, “An Exploration of Causes for Delay and Cost Overruns in Construction Projects: Case Study of Australia,” 2016 | 10.3126/jacem.v2i0.16097 | not held here |
| 10 | ref10 G. Sweis, R. Sweis, A. Abu Hammad, and A. Shboul, “Delays in construction projects: The case of Jordan,” Int. J. Proj. Manag., vol. 26, no. 6, pp. 665–674, Aug. 2008, doi: 10.1016… | 10.1016/j.ijproman.2007.09.009 | not held here |
| 11 | ref11 P. K.V, V. Vasuki, V. R, and N. Bhat, “Analysis of causes of delay in Indian construction projects and mitigation measures,” J. Financ. Manag. Prop. Constr., vol. 24, no. 1, pp. 5… | 10.1108/jfmpc-04-2018-0020 | not held here |
| 12 | ref12 S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” Int. J. Proj. Manag., vol. 24, no. 4, pp. 349–357, May 2006, doi: 10.1016/j.ijproman.2005.11.010 | 10.1016/j.ijproman.2005.11.010 | not held here |
| 14 | ref14 T. Gebrehiwet and H. Luo, “Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study,” Procedia Eng., vol. 196, no. June, pp. 366–… | 10.1016/j.proeng.2017.07.212 | not held here |
| 15 | ref15 A. A. Aibinu and G. O. Jagboro, “The effects of construction delays on project delivery in the Nigerian construction industry,” Int. J. Proj. Manag., vol. 20, no. 8, pp. 593–599, … | 10.1016/s0263-7863(02)00028-5 | not held here |
Relations
The record states no relation, and no record held here states one with this DOI.
Funding
The record names no funder.
Each funder's page lists every work held here that names it. ROR IDs open at ror.org; Funder Registry IDs resolve at doi.org.
History — the ledger
Every change to this DOI, in order, as it was recorded. Entries are only ever added, never changed or removed.
| # | When | What | By | Changes |
|---|---|---|---|---|
| 1 | 29 Sep 2026, 10:00 PM | register registered at Crossref; record read from api.crossref.org | Administrator (admin) | 90 fields set · sha256 bee7c323e2d8… |
| 2 | 29 Sep 2026, 11:59 PM | update record re-read from api.crossref.org | Administrator (admin) | container.titles.0.value: |
Machine-readable: the history as JSON, with the full record after each change.
Changes made at Crossref through DOI Doctor
Every deposit Smart Scholars' DOI Doctor made for this DOI, oldest first, with Crossref's own answer. Each fingerprint is the SHA-256 of its entry and of the fingerprint before it, so a change to any earlier entry changes every fingerprint after it.
| When | What changed | Crossref | Fingerprint |
|---|---|---|---|
| 11 Sep 2026, 05:18 | Address updated from https://jst.org.in/index.php/pub/article/view/470/415 to https://www.jst.org.in/index.php/pub/article/view/470 | ● accepted by Crossref | ebfd7d7d6829… |
| 13 Sep 2026, 01:40 | Read back: the DOI resolves to the new address | ● confirmed | 94975e3bd475… |
| 07 Oct 2026, 07:37 | Metadata completed abstract (131 words) · licence | ● accepted by Crossref | 1b14bc3ce8af… |
| 07 Oct 2026, 08:47 | Read back: Crossref's record shows it | ● confirmed | b0a4c963e837… |
4 entries · the last fingerprint b0a4c963e837f3b4c4c5ca2c94a385533ab44c265844844d922e2f89dc272fbe · the history as JSON, each entry with the fingerprint before it, to check them yourself.



