Cite this DOI
10.46243/jst.2022.v7.i02.pp281-290 · An evaluation of the causes of construction project delays in the urban areas of South Gujarat
APA (7th edition)
Smit S. Chaudhari, S. S. C. (2022). An evaluation of the causes of construction project delays in the urban areas of South Gujarat. *Journal of Science & Technology*, *7*(2), 281–290. https://doi.org/10.46243/jst.2022.v7.i02.pp281-290
⬇ text Italics are shown as *asterisks* in plain text — the journal or book title and the volume.
BibTeX
@article{smitschaudhari2022evaluation,
author = {Smit S. Chaudhari, Smit S. Chaudhari},
title = {{An evaluation of the causes of construction project delays in the urban areas of South Gujarat}},
journal = {Journal of Science \& Technology},
year = {2022},
month = {jul},
volume = {7},
number = {2},
pages = {281--290},
publisher = {Longman Publishers},
issn = {2456-5660},
doi = {10.46243/jst.2022.v7.i02.pp281-290},
url = {https://doi.org/10.46243/jst.2022.v7.i02.pp281-290},
language = {en},
abstract = {In India, construction projects are facing major problems due to delays. These problems are harming economic success and development. The purpose of this study is to identify the most significant factors that cause delays in construction projects through a survey. A survey was carried out on the various stack holders of construction industries such as a rchitects, engineers, owners, contractors, supervisors, and labours. Out of 30 reasons, 5 major factors are identified using the Relative Important Index (RII) method. The case study results suggest that the most critical factors are Poor monitoring and co ntrol, Rework due to errors during construction, High labour wages, Lack of communication with consultant/owner, and Shortage of labour. These findings are likely to contribute significantly to the Indian construction industry's control of project time and cost overrun}
}RIS (EndNote, Zotero, Mendeley)
TY - JOUR TI - An evaluation of the causes of construction project delays in the urban areas of South Gujarat AU - Smit S. Chaudhari, Smit S. Chaudhari JO - Journal of Science & Technology PY - 2022 DA - 2022/07/03/ VL - 7 IS - 2 SP - 281 EP - 290 PB - Longman Publishers SN - 2456-5660 LA - en AB - In India, construction projects are facing major problems due to delays. These problems are harming economic success and development. The purpose of this study is to identify the most significant factors that cause delays in construction projects through a survey. A survey was carried out on the various stack holders of construction industries such as a rchitects, engineers, owners, contractors, supervisors, and labours. Out of 30 reasons, 5 major factors are identified using the Relative Important Index (RII) method. The case study results suggest that the most critical factors are Poor monitoring and co ntrol, Rework due to errors during construction, High labour wages, Lack of communication with consultant/owner, and Shortage of labour. These findings are likely to contribute significantly to the Indian construction industry's control of project time and cost overrun DO - 10.46243/jst.2022.v7.i02.pp281-290 UR - https://doi.org/10.46243/jst.2022.v7.i02.pp281-290 ER -
CSL-JSON
{
"type": "article-journal",
"id": "10.46243/jst.2022.v7.i02.pp281-290",
"DOI": "10.46243/jst.2022.v7.i02.pp281-290",
"URL": "https://doi.org/10.46243/jst.2022.v7.i02.pp281-290",
"title": "An evaluation of the causes of construction project delays in the urban areas of South Gujarat",
"source": "Smart Scholars DOI Registry",
"container-title": "Journal of Science & Technology",
"author": [
{
"family": "Smit S. Chaudhari",
"given": "Smit S. Chaudhari"
}
],
"issued": {
"date-parts": [
[
2022,
7,
3
]
]
},
"volume": "7",
"issue": "2",
"page": "281-290",
"publisher": "Longman Publishers",
"language": "en",
"abstract": "In India, construction projects are facing major problems due to delays. These problems are harming economic success and development. The purpose of this study is to identify the most significant factors that cause delays in construction projects through a survey. A survey was carried out on the various stack holders of construction industries such as a rchitects, engineers, owners, contractors, supervisors, and labours. Out of 30 reasons, 5 major factors are identified using the Relative Important Index (RII) method. The case study results suggest that the most critical factors are Poor monitoring and co ntrol, Rework due to errors during construction, High labour wages, Lack of communication with consultant/owner, and Shortage of labour. These findings are likely to contribute significantly to the Indian construction industry's control of project time and cost overrun",
"ISSN": "2456-5660"
} ⬇ .json What citeproc and reference managers read; the DOI system hands it out for Accept: application/vnd.citationstyles.csl+json, and so does this registry's resolver.
From the record as registered (version 2) — the record and its history. Programs: https://registry.smartscholars.in/api.php?action=cite&doi=10.46243%2Fjst.2022.v7.i02.pp281-290 gives all four in one JSON answer.
