10.46243/jst.2022.v7.i05.pp73-116 registered
Risk Management in Construction Projects in Afghanistann
Resolves to https://www.jst.org.in/index.php/pub/article/view/498
Held by Longman Publishers (India) · prefix 10.46243 live · DOI address https://doi.org/10.46243/jst.2022.v7.i05.pp73-116
Registered 29 Sep 2026 via crossref · record version 2 · last change 29 Sep 2026, 11:59 PM · record sha256 6c3da0726b6211bf…
Resolve ⬇ Record (JSON) ⬇ Kernel Metadata Declaration (XML) Compare with Crossref Cite (APA · BibTeX · RIS · CSL)
What the DOI identifies
JournalArticle — an article in a journal · Digital · Visual · en
Risk Management in Construction Projects in Afghanistann (PrincipalTitle)
Published 2023-07-18
Part of Journal of Science & Technology · ISSN 2456-5660 · volume 7 · issue 5 · pages 73–116
Agents
- Inayatullah Mohib Inayatullah Mohib (author)
- Longman Publishers (publisher)
Identifiers DOI 10.46243/jst.2022.v7.i05.pp73-116
Abstract
The topic of this research is Risk Management in Construction Projects in Afghanistan. The main purpose of this paper is to identify risk factors and how to mitigate, minimize, and response to those identified risk factors. The main scope of this study is done by doing questionary survey by filling the designed format in which all aspects related to risk management and its mitigation are placed by different question methods. The result of the questionary survey has diverse outcome including risk management, risk assessment, main causes of delays, types of risk in construction industries, risk management process steps, mitigation of identified risk in construction projects, and impact of identified risk factors on main component of the project (cost, quality, and schedule). In addition, these findings provide additional information about financial risk and delay in implementation of the project are also critically important, because most of the mega projects in Afghanistan are funding by numerous international organizations/donors. Some of the financial risks in constructions industry are currency exchange rates, income taxes, inappropriate estimation of the projects, working items, unexpected increment in price of materials, procurement, and delay in payment process. These are some of the main financial risk factors which have direct impact on the construction projects. On the other hand, the main causes of being behind the schedule are security issues, poor management, delay in supply of construction materials and social destructions as well. As a result, all construction projects have different risk from the initial to inauguration phase therefore, proper technical team of the management especially the sector of risk management is indispensable to be involved in every construction industry, however, in Afghanistan the stance of risk management is not common to be considered according to this research investigation. It’s recommended that a proper team of risk management with experts in management, especially in risk management should be considered in every planning project. This will assist the project manager to reduce risks and execute stable project within time and budget. www.jst.org.in DOI:https://doi.org/10.46243/jst.2022.v7.i05.pp73-116 Table of Contents
System metadata — ISO 26324:2025, Annex B · DOI Handbook 10.1
Each element by the standard's name (Annex B: reference elements, then administrative) and the Handbook's (in grey), read off the record above.
| Element | Value | In the record |
|---|---|---|
| DOI Name DOI name | 10.46243/jst.2022.v7.i05.pp73-116 | doi |
| Referent Type referentType | Creation | referent |
| Referent Sub-Type referentSubType | JournalArticle — an article in a journal | type |
| Referent Name(s) referentName(s) | Risk Management in Construction Projects in Afghanistann (PrincipalTitle, en) | titles |
| Basic Metadata basicMetadata | author: Inayatullah Mohib Inayatullah Mohib publisher: Longman Publishers published: 2023-07-18 part of: Journal of Science & Technology · ISSN 2456-5660 · vol. 7 · no. 5 · pp. 73–116 language: en form: Digital · Visual · Language | agents, dates, container, language, structural_type, modes, characters |
| Referent Identifier(s) alternateIdentifier(s) | none besides the DOI | identifiers, relations (IsSameAs) |
| Registration Authority registrationAuthorityCode | Crossref — issued by Crossref (member 25296); held here as a copy | record.source_agency (our code, ra_doi_name, for names issued here once appointed) |
| Created Date issueDate | 2024-02-16 | record.registered (when the DOI name was first registered) |
| relatedIdentifiers | none needed — the descriptive metadata is in this record | container, relations (only where the descriptive metadata lives at another identifier) |
complete Every System Metadata element is here, with the basic metadata a journal article needs.
The System Metadata Declaration (JSON) · the Kernel Metadata Declaration (XML) · what each sub-type needs
History — the ledger
Every change to this DOI, in order, as it was recorded. Entries are only ever added, never changed or removed.
| # | When | What | By | Changes |
|---|---|---|---|---|
| 1 | 29 Sep 2026, 10:00 PM | register registered at Crossref; record read from api.crossref.org | Administrator (admin) | 71 fields set · sha256 978a438e955d… |
| 2 | 29 Sep 2026, 11:59 PM | update record re-read from api.crossref.org | Administrator (admin) | container.titles.0.value: |
Machine-readable: the history as JSON, with the full record after each change.
