Smart Scholars🛡 Scholar Shield🏛 Research Integrity Desk🧩 Portfolio Console📰 Journals🔧 DOI MembersTools🔎 Journal AuditGI GetIndexedDr DOI Doctor

Cite this DOI

10.46243/jst.2024.v9.i012.pp01-15 · REAL-TIME PROGNOSTICS AND HEALTH MANAGEMENT WITHOUT RUN-TO-FAILURE DATA ON RAILWAY ASSETS

APA (7th edition)

M.SaratChandra Prasad, & Ms.T.Satya Kumari (2024). REAL-TIME PROGNOSTICS AND HEALTH MANAGEMENT WITHOUT RUN-TO-FAILURE DATA ON RAILWAY ASSETS. *Journal of Science & Technology*, *09*(12), 01–15. https://doi.org/10.46243/jst.2024.v9.i012.pp01-15

⬇ text Italics are shown as *asterisks* in plain text — the journal or book title and the volume.

BibTeX

@article{msaratchandraprasad2024realtime,
  author    = {M.SaratChandra Prasad and Ms.T.Satya Kumari},
  title     = {{REAL-TIME PROGNOSTICS AND HEALTH MANAGEMENT WITHOUT RUN-TO-FAILURE DATA ON RAILWAY ASSETS}},
  journal   = {Journal of Science \& Technology},
  year      = {2024},
  month     = {dec},
  volume    = {09},
  number    = {12},
  pages     = {01--15},
  publisher = {Longman Publishers},
  issn      = {2456-5660},
  doi       = {10.46243/jst.2024.v9.i012.pp01-15},
  url       = {https://doi.org/10.46243/jst.2024.v9.i012.pp01-15},
  language  = {en},
  abstract  = {Predictive maintenance is fundamental for working on the dependability and execution of assorted parts and frameworks. In any case, the shortfall of open rush to-disappointment information every now and again blocks the making of exact prognostic models. This study handles this trouble by presenting a creative prognostic strategy explicitly intended for reasonable railroad support arranging, with an accentuation on entryway frameworks. The significant objective is to give a prognostic methodology fit for determining the leftover valuable existence of railroad entryway frameworks without relying upon race to-disappointment information. The strategy tries to work with productive prescient upkeep arranging by assessing shortcoming seriousness and computing the time left until basic issue limits are reached. The proposed approach utilizes engine current signs to deliver a disintegration marker for rail line entryway frameworks. “Dynamic time warping (DTW)”is used to assess the closeness among typical and blemished conduct, though the K-meansprocedure is applied to decide shortcoming seriousness. A delegate time assessment is performed for every seriousness level, empowering the estimate of residual time until basic shortcoming levels are accomplished. This strategy doesn't require rush to-disappointment information. The proposed strategy, through preliminary and examination, is valuable in prescient support making arrangements for railroad entryway frameworks. The strategy offers valuable experiences for opportune support intercessions by definitively assessing shortcoming seriousness and guaging the leftover time until significant flaws happen. K-means bunching has been refined, and Random Forest along with a Stacking Classifier (LGBM+RF+DT) has been integrated into the undertaking to foresee predisposition type, with a great exactness pace of 99.5\%.}
}

⬇ .bib

RIS (EndNote, Zotero, Mendeley)

TY  - JOUR
TI  - REAL-TIME PROGNOSTICS AND HEALTH MANAGEMENT WITHOUT RUN-TO-FAILURE DATA ON RAILWAY ASSETS
AU  - M.SaratChandra Prasad
AU  - Ms.T.Satya Kumari
JO  - Journal of Science & Technology
PY  - 2024
DA  - 2024/12/17/
VL  - 09
IS  - 12
SP  - 01
EP  - 15
PB  - Longman Publishers
SN  - 2456-5660
LA  - en
AB  - Predictive maintenance is fundamental for working on the dependability and execution of assorted parts and frameworks. In any case, the shortfall of open rush to-disappointment information every now and again blocks the making of exact prognostic models. This study handles this trouble by presenting a creative prognostic strategy explicitly intended for reasonable railroad support arranging, with an accentuation on entryway frameworks. The significant objective is to give a prognostic methodology fit for determining the leftover valuable existence of railroad entryway frameworks without relying upon race to-disappointment information. The strategy tries to work with productive prescient upkeep arranging by assessing shortcoming seriousness and computing the time left until basic issue limits are reached. The proposed approach utilizes engine current signs to deliver a disintegration marker for rail line entryway frameworks. “Dynamic time warping (DTW)”is used to assess the closeness among typical and blemished conduct, though the K-meansprocedure is applied to decide shortcoming seriousness. A delegate time assessment is performed for every seriousness level, empowering the estimate of residual time until basic shortcoming levels are accomplished. This strategy doesn't require rush to-disappointment information. The proposed strategy, through preliminary and examination, is valuable in prescient support making arrangements for railroad entryway frameworks. The strategy offers valuable experiences for opportune support intercessions by definitively assessing shortcoming seriousness and guaging the leftover time until significant flaws happen. K-means bunching has been refined, and Random Forest along with a Stacking Classifier (LGBM+RF+DT) has been integrated into the undertaking to foresee predisposition type, with a great exactness pace of 99.5%.
DO  - 10.46243/jst.2024.v9.i012.pp01-15
UR  - https://doi.org/10.46243/jst.2024.v9.i012.pp01-15
ER  -

⬇ .ris

CSL-JSON

{
    "type": "article-journal",
    "id": "10.46243/jst.2024.v9.i012.pp01-15",
    "DOI": "10.46243/jst.2024.v9.i012.pp01-15",
    "URL": "https://doi.org/10.46243/jst.2024.v9.i012.pp01-15",
    "title": "REAL-TIME PROGNOSTICS AND HEALTH MANAGEMENT WITHOUT RUN-TO-FAILURE DATA ON RAILWAY ASSETS",
    "source": "Smart Scholars DOI Registry",
    "container-title": "Journal of Science & Technology",
    "author": [
        {
            "family": "M.SaratChandra Prasad"
        },
        {
            "family": "Ms.T.Satya Kumari"
        }
    ],
    "issued": {
        "date-parts": [
            [
                2024,
                12,
                17
            ]
        ]
    },
    "volume": "09",
    "issue": "12",
    "page": "01-15",
    "publisher": "Longman Publishers",
    "language": "en",
    "abstract": "Predictive maintenance is fundamental for working on the dependability and execution of assorted parts and frameworks. In any case, the shortfall of open rush to-disappointment information every now and again blocks the making of exact prognostic models. This study handles this trouble by presenting a creative prognostic strategy explicitly intended for reasonable railroad support arranging, with an accentuation on entryway frameworks. The significant objective is to give a prognostic methodology fit for determining the leftover valuable existence of railroad entryway frameworks without relying upon race to-disappointment information. The strategy tries to work with productive prescient upkeep arranging by assessing shortcoming seriousness and computing the time left until basic issue limits are reached. The proposed approach utilizes engine current signs to deliver a disintegration marker for rail line entryway frameworks. “Dynamic time warping (DTW)”is used to assess the closeness among typical and blemished conduct, though the K-meansprocedure is applied to decide shortcoming seriousness. A delegate time assessment is performed for every seriousness level, empowering the estimate of residual time until basic shortcoming levels are accomplished. This strategy doesn't require rush to-disappointment information. The proposed strategy, through preliminary and examination, is valuable in prescient support making arrangements for railroad entryway frameworks. The strategy offers valuable experiences for opportune support intercessions by definitively assessing shortcoming seriousness and guaging the leftover time until significant flaws happen. K-means bunching has been refined, and Random Forest along with a Stacking Classifier (LGBM+RF+DT) has been integrated into the undertaking to foresee predisposition type, with a great exactness pace of 99.5%.",
    "ISSN": "2456-5660"
}

⬇ .json What citeproc and reference managers read; the DOI system hands it out for Accept: application/vnd.citationstyles.csl+json, and so does this registry's resolver.

From the record as registered (version 2) — the record and its history. Programs: https://registry.smartscholars.in/api.php?action=cite&doi=10.46243%2Fjst.2024.v9.i012.pp01-15 gives all four in one JSON answer.

Everything Smart Scholars runsNine sites, one account. A journal starts at the audit; an author starts at Scholar Shield.

For journals & publishers

Start with the audit — it is free, and it is the gate to everything else.

DOI care

Nine services on one journal profile — each previews first and acts only on your approval.

For authors & researchers

Free to use. Nothing you check is shared with the journal.

For institutions, sponsors & DOI operators

Smart Scholars

Mon–Sat, 10:00–19:00 IST. The Ask AI button on every page answers about our services at any hour.

News

Policies

What we can register a DOI for

20 kinds of record, one account, one place. Every one gets a DOI that resolves, metadata that indexes read, and a record that stays correct afterwards.
Journals
  • Journal articles
  • Journal titles
  • Pending publications
  • Peer reviews
  • Preprints & posted content
Books & conferences
  • Books
  • Book chapters
  • Book series
  • Book sets
  • Conference proceedings
  • Proceedings series
  • Conference papers
Other research output
  • Theses & dissertations
  • Reports & working papers
  • Report series
  • Standards
  • Databases
  • Datasets
  • Figures, tables & supplements
Funding
  • Grants & funding awards

Elsewhere

The same company, in the places our publishers already read.
Smart Scholars · Every service on one pageData from OpenAlex (openalex.org), CC0 · Crossref · ISSN Portal · DOAJContact
WhatsApp