{
    "ok": true,
    "doi": "10.46243/jst.2022.v7.i02.pp281-290",
    "references_in_record": 15,
    "not_read": [],
    "own_doi": [],
    "total": 6,
    "page": 1,
    "pages": 1,
    "per_page": 20,
    "items": [
        {
            "position": 2,
            "key": "ref2",
            "doi": "10.3126/jacem.v2i0.16097",
            "doi_url": "https://doi.org/10.3126/jacem.v2i0.16097",
            "unstructured": "R. K. Shah, “An Exploration of Causes for Delay and Cost Overruns in Construction Projects: Case Study of Australia,” 2016",
            "held": false
        },
        {
            "position": 10,
            "key": "ref10",
            "doi": "10.1016/j.ijproman.2007.09.009",
            "doi_url": "https://doi.org/10.1016/j.ijproman.2007.09.009",
            "unstructured": "G. Sweis, R. Sweis, A. Abu Hammad, and A. Shboul, “Delays in construction projects: The case of Jordan,” Int. J. Proj. Manag., vol. 26, no. 6, pp. 665–674, Aug. 2008, doi: 10.1016/j.ijproman.2007.09.009",
            "held": false
        },
        {
            "position": 11,
            "key": "ref11",
            "doi": "10.1108/jfmpc-04-2018-0020",
            "doi_url": "https://doi.org/10.1108/jfmpc-04-2018-0020",
            "unstructured": "P. K.V, V. Vasuki, V. R, and N. Bhat, “Analysis of causes of delay in Indian construction projects and mitigation measures,” J. Financ. Manag. Prop. Constr., vol. 24, no. 1, pp. 58–78, Mar. 2019, DOI: 10.1108/JFMPC-04-2018-0020",
            "held": false
        },
        {
            "position": 12,
            "key": "ref12",
            "doi": "10.1016/j.ijproman.2005.11.010",
            "doi_url": "https://doi.org/10.1016/j.ijproman.2005.11.010",
            "unstructured": "S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” Int. J. Proj. Manag., vol. 24, no. 4, pp. 349–357, May 2006, doi: 10.1016/j.ijproman.2005.11.010",
            "held": false
        },
        {
            "position": 14,
            "key": "ref14",
            "doi": "10.1016/j.proeng.2017.07.212",
            "doi_url": "https://doi.org/10.1016/j.proeng.2017.07.212",
            "unstructured": "T. Gebrehiwet and H. Luo, “Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study,” Procedia Eng., vol. 196, no. June, pp. 366–374, 2017, DOI: 10.1016/j.proeng.2017.07.212",
            "held": false
        },
        {
            "position": 15,
            "key": "ref15",
            "doi": "10.1016/s0263-7863(02)00028-5",
            "doi_url": "https://doi.org/10.1016/s0263-7863(02)00028-5",
            "unstructured": "A. A. Aibinu and G. O. Jagboro, “The effects of construction delays on project delivery in the Nigerian construction industry,” Int. J. Proj. Manag., vol. 20, no. 8, pp. 593–599, 2002, DOI: 10.1016/S0263-7863(02)00028-5",
            "held": false
        }
    ]
}